Gravel Calculator

Estimate gravel for rectangular, circular or triangular areas and roadway or trench fill, in cubic yards, metric tonnes and US short tons, with cost.

Check your inputs—Complete valid inputs to calculate a current result.
m or ft

0.001 – 1,000,000,000 m or ft

m or ft

0.001 – 1,000,000,000 m or ft

cm or in

0.001 – 1,000,000,000 cm or in

%

0 – 100 %

kg/m³

1 – 10,000 kg/m³

Gravel quantity including allowance

1.1000 m³

  • Cubic yards1.4387
  • Cubic feet38.8461
  • Mass at entered bulk density1.7600 metric tonnes
  • Weight in US short tons1.9401 short tons

Uniform rectangular fill estimate. Density depends on stone size, moisture and compaction; confirm the supplier’s density and ordering units.

How this was calculated

  1. V = length × width × depthPut in your numbers: 5 m × 4 m × (5 cm ÷ 100)Answer: 1 m³
  2. Order volume = volume × (1 + allowance/100)Put in your numbers: 1 m³ × (1 + 10/100)Answer: 1.1 m³
  3. Cubic yards = m³ ÷ 0.764554857984Put in your numbers: 1.1 ÷ 0.764554857984Answer: 1.4387 yd³ (38.8461 ft³)
  4. Mass = volume × bulk density; short tons = kg ÷ 907.18474Put in your numbers: 1.1 m³ × 1,600 kg/m³ = 1,760 kg; 1,760 ÷ 907.18474Answer: 1.76 t (metric); 1.9401 short tons

Formula and method

Volume in m³ = length × width × depth × allowance factor. Metric tonnes = volume × density in kg/m³ ÷ 1,000.

Worked example

A 5 m × 4 m area at 5 cm depth, with 10% extra, needs 1.1 m³. At 1,600 kg/m³ this is 1.76 metric tonnes.

Area shapes and roadway fill

Circular areas use π/4 × diameter² × depth and triangular areas ½ × base × height × depth. Roadway or trench fill multiplies length × width × compacted depth, then adds a compaction or cut-fill allowance for the extra loose material needed to reach that depth, before the ordering allowance.

Tonnes and short tons

Mass = volume × bulk density. Metric tonnes divide kilograms by 1,000; US short tons divide by 907.18474 (2,000 lb). Suppliers quote either unit, so check which one before comparing prices. Cost can be priced per short ton, tonne, cubic yard or cubic meter.

Worked example: roadway

A driveway base 100 ft long, 12 ft wide and 6 in deep is 600 ft³. With a 15% compaction allowance and the extra-material allowance set to 0%, that becomes 690 ft³, or 25.56 yd³. At 1,600 kg/m³ this is about 31.26 metric tonnes, or 34.46 US short tons. With the default 10% extra-material allowance the order is 759 ft³ (28.11 yd³), about 34.39 tonnes or 37.91 short tons.

Frequently asked questions

Is the density the same for every gravel?

No. Gradation, moisture and compaction change bulk density. Use supplier information and distinguish metric tonnes from US short tons.

What compaction allowance should I use for road base?

Use the figure from your supplier or engineer. It depends on the material’s gradation, moisture and compaction equipment. The default is an editable planning value, not a specification.

How do I convert gravel cubic yards to tons?

Multiply cubic meters by the bulk density in kg/m³ for kilograms, then divide by 907.18474 for US short tons. The calculator shows both steps with your numbers.